ISLE PIERRE, BC GRADING AND DRAINAGE FOR NICHOL SIDING EXTENSION

Scope of Work:

Earthworks for over 4 km of rail siding extension including clearing and grubbing, stripping and common excavation, rock blasting, 50,000 m3 of borrow fill, supply and installation of sub ballast, existing culvert extensions, new augured culverts ranging from 900mm 1800mm diameter, environmentally sensitive instream works, MSE retaining walls, and slope stabilization work. Work was completed without interrupting existing rail mainline.

June 2018 – February 2019