PRINCE GEORGE, BC HENREY ROAD WATERMAIN AND UPGRADES

Scope of Work:

Upgrades include approximately 500lm of watermain c/w valves, bends and fittings; flushing and testing; storm main, catch basins, manholes and inlet structures; clearing and grubbing; stripping and common excavation; realignment of existing roadway and placement of base gravels; asphalt paving; concrete curb and sidewalks; street lighting; block retaining wall and landscaping.

May 2020 – Current