STEWART, BC WATER RESERVOIR, WATERMAIN AND ACCESS ROAD

Scope of Work:

Watermain and access road construction for a new reservoir in Stewart, BC.
Work included clearing and grubbing, stripping, common excavation, and drilling and blasting; installation of approximately 300lm of watermain c/w valves, bends, fittings and anchor blocks; installation of a prefabricated reservoir; flushing and testing; electrical; and remove and replace of public roadways.

April 2020 – Current